Projects 01

Wagerup BESS Project - 100MW/200MWh
Project Overview
Developer:
Alinta Energy Location: Western Australia Purpose: Provide backup capacity & grid stability for the South West Interconnected System (SWIS).
RESI‘s Scope
Battery System & PCS integration 33kV switch room & 330kV GIS setup Transformer & high-voltage connection
Alinta Energy Location: Western Australia Purpose: Provide backup capacity & grid stability for the South West Interconnected System (SWIS).
RESI‘s Scope
Battery System & PCS integration 33kV switch room & 330kV GIS setup Transformer & high-voltage connection


Projects 02

Wollar Solar Farm – 345MWdc
Project Overview
Location: Near Mudgee, NSW Capacity: 345MWdc, ~660,000 solar panels Investment: ~AUD 500 million Construction Timeline: 18 months, 400 workers at peak
RESI’s Scope
Site investigations & design Procurement & civil works Mechanical & electrical installation SCADA & control system integration Commissioning, testing & O&M
Location: Near Mudgee, NSW Capacity: 345MWdc, ~660,000 solar panels Investment: ~AUD 500 million Construction Timeline: 18 months, 400 workers at peak
RESI’s Scope
Site investigations & design Procurement & civil works Mechanical & electrical installation SCADA & control system integration Commissioning, testing & O&M